Aggarwal GlobalEmpowering Nation Enquire

About the group

Two decades of building India’s electrical backbone.

From a single product line to an integrated manufacturer of the complete power chain — anchored by a 70,000 sq. yard campus in Haryana and 1,500 people.

The integrated campus from the air · Dulehri, Tosham, Bhiwani

The integrated campus from the air · Dulehri, Tosham, Bhiwani

01

Our story

Everything was added around the pole yard.

Pole casting began in 2005 and the group was established in 2006. LT cable followed in 2015, lattice towers in 2017, transformers and HDPE pipe in 2020 and the galvanizing plant in 2021 — alongside dozens of power substations built across Haryana.

Today it is a fully integrated electrical infrastructure manufacturer, producing transformers from 16 kVA to 20 MVA, lattice towers, ACSR conductors, HDPE and drip-lateral pipes, and operating a galvanized iron plant — all from a 70,000 sq. yard campus.

That vertical integration lets us control quality from raw steel and polymer through to finished, tested product — the reliability that industrial buyers, EPC contractors, export customers and utilities depend on.

The works against the Tosham hills
Temple on the campus grounds
2006
founded
70,000
sq. yard campus
1,500+
people
₹800Cr
group turnover
02

Our journey

From one line to the whole chain.

Each new capability was added to serve the same customer better — building outward from poles and cables into complete power and irrigation infrastructure.

2005

PCC poles

Pole casting begins; the group is established the following year.

Pole casting beds
2015

LT cables

Entry into low-tension cable manufacturing.

Cable hall
2017

Lattice towers

Transmission tower fabrication and ACSR conductor lines.

Galvanized tower sections
2020

Transformers

Distribution and power transformer manufacture.

Transformer dispatch yard
2020

HDPE & drip

HDPE pipe and drip-lateral irrigation systems.

HDPE extrusion line
2021

Galvanizing

Hot and cold dip galvanized iron plant.

Zinc bath
Today

Integrated group

A 70,000 sq. yard integrated manufacturing campus, still growing.

The works today
03

How we work

Owning the process, end to end.

Four commitments that follow from making the whole chain rather than one link of it.

01

In-house testing

Every transformer, conductor and cable is tested before dispatch — not sampled after delivery.

02

Integrated control

Vertical manufacturing means quality is owned end to end, from raw steel to finished unit.

03

Sustainable output

Water-efficient irrigation and durable, long-life infrastructure built to last decades.

04

Delivery we control

Galvanizing, fabrication and assembly on one site removes the queues that delay most supply chains.

The campus keeps growing

New sheds, new bays.

Production sheds photographed during construction in 2025, and the surrounding industrial estate.

New production sheds, 2025
New production sheds, 2025
Shed under a monsoon sky
Shed under a monsoon sky
Access road between the new bays
Access road between the new bays
Roofing complete
Roofing complete
Site boundary
Site boundary
Rooftop solar array
Rooftop solar array
Office block
Office block

Want to see the works?