Supply · Andhra Pradesh
Power Transformers in Andhra Pradesh
1 – 20 MVA. Delivery across Andhra Pradesh about 7 days by road, built to the specification your utility or project issues.

Power transformer under assembly
Logistics and network
Supplying Andhra Pradesh.
Deliveries across Andhra Pradesh start at about 1790 km by road, which puts the nearer cities (Rajahmundry, Visakhapatnam, Vijayawada) within 7 days of dispatch. The state's demand centres on Visakhapatnam steel and port, Kakinada and Krishnapatnam ports, Sri City and Nellore industrial corridors, Anantapur and Kurnool solar parks.
Distribution in Andhra Pradesh is handled by APEPDCL, APSPDCL and APCPDCL; APTRANSCO runs the transmission network. Programmes now in execution include RDSS, Kuppam and Anantapur solar parks, and each is tendered against a technical specification that we quote and manufacture to.
The power transformer line closed the last gap in the chain. Between distribution and power class we now cover 16 kVA right through to 20 MVA — a span very few regional manufacturers hold on a single site.
The standard substation build is 33/11 kV, Dyn11, ONAN, with an off-circuit tap changer at +5% to −10%. Where the network needs voltage regulation under load we fit an on-load tap changer at +5% to −15%, and where the load profile justifies forced cooling we supply ONAF with a rated output at each cooling stage.
| Parameter | Specification |
|---|---|
| Rated power | 1 MVA to 20 MVA |
| Typical ratings | 1 · 1.6 · 2 · 2.5 · 3.15 · 5 · 6.3 · 8 · 10 · 12.5 · 16 · 20 MVA |
| Voltage class | 33 / 11 kV; highest system voltage 36 kV |
| Phases | Three-phase |
| Type | Oil-immersed, outdoor, core type — plain or corrugated tank; dry type to order |
| Frequency | 50 Hz standard; 60 Hz for export |
Specifying
What changes for Andhra Pradesh.
- Design ambient 50 °C; seismic classification Zone III for structures and foundations.
- Coastal and industrial exposure: C5-M grade exterior paint, stainless or hot-dip galvanized hardware and heavier zinc coating on steel parts for sites near the coast.
- Temperature rise 45 K winding and 40 K top oil over the stated ambient, or 55 K / 50 K where APEPDCL specifications allow; losses, impedance and tapping to the utility schedule or IS 1180 level.
Questions
Frequently asked.
How long does delivery of Power Transformers to Andhra Pradesh take?
Can you build to the APEPDCL specification?
Do you supply private buyers and contractors across Andhra Pradesh, not only utilities?
Send us your Power Transformers schedule for Andhra Pradesh.
Ratings, quantities, the specification you are buying against and the delivery point. We return a quotation with a firm delivery programme.