Solar & Inverter Duty Transformers in Karnataka

Up to 20 MVA. Delivery across Karnataka about 6 days by road, built to the specification your utility or project issues.

RangeUp to 20 MVA
Deliveryabout 6 days by road
StandardIEC 60076 · IEEE C57.159
Tanks awaiting core-and-coil assembly

Tanks awaiting core-and-coil assembly

01

Logistics and network

Supplying Karnataka.

Deliveries across Karnataka start at about 1600 km by road, which puts the nearer cities (Kalaburagi, Belagavi, Hubballi) within 6 days of dispatch. The state's demand centres on Bengaluru electronics and aerospace, Pavagada solar park, Bellary and Hospet steel, Mangaluru port and refinery, Belagavi foundries, Hubballi-Dharwad engineering.

Distribution in Karnataka is handled by BESCOM, MESCOM, HESCOM, GESCOM and CESC Mysuru; KPTCL runs the transmission network. Programmes now in execution include RDSS, Pavagada and Tumakuru solar parks, Gruha Jyothi, and each is tendered against a technical specification that we quote and manufacture to.

02

The product

A solar transformer is not a distribution transformer with a different label.

Full specification and gallery

An inverter feeds the transformer a non-sinusoidal current with significant harmonic content, and it does so on a duty cycle that is de-energised for roughly half the year. Both facts change the design.

Harmonic currents drive eddy-current heating in the windings that a standard design does not allow for, so conductors are transposed and the core flux density is de-rated to leave headroom. The overnight de-energised period means no-load loss dominates lifetime energy cost far more than it does on a distribution feeder — which is why the low-no-load-loss design is worth paying for here and not always elsewhere.

ParameterSpecification
Rated powerUp to 20 MVA
HV voltage11 kV or 33 kV
LV voltage315 / 380 / 415 / 480 / 600 / 690 / 800 V — the inverter output, not 433 V
Winding arrangementTwo, three or more secondaries; dual secondary is the norm
DutyStep-up, outdoor, solar or wind generation
Frequency50 Hz standard; 60 Hz for export
03

Specifying

What changes for Karnataka.

  • Design ambient 45 °C; seismic classification Zone III for structures and foundations.
  • Coastal and industrial exposure: C5-M grade exterior paint, stainless or hot-dip galvanized hardware and heavier zinc coating on steel parts for sites near the coast.
  • Temperature rise 45 K winding and 40 K top oil over the stated ambient, or 55 K / 50 K where BESCOM specifications allow; losses, impedance and tapping to the utility schedule or IS 1180 level.
FAQ

Questions

Frequently asked.

How long does delivery of Solar & Inverter Duty Transformers to Karnataka take?
Road transit is about 6 days for a full load over roughly 1600 km. Manufacturing time depends on the rating and quantity and is confirmed with the quotation.
Can you build to the BESCOM specification?
Yes. We quote against the utility's technical specification and guaranteed technical particulars, and routine tests are witnessed at our works by the purchaser or a third-party inspector before dispatch.
Do you supply private buyers and contractors across Karnataka, not only utilities?
Yes. Industrial plants, EPC contractors, solar developers, builders and dealers across Karnataka buy directly; send the schedule and we return a quotation with a delivery programme.

Send us your Solar & Inverter Duty Transformers schedule for Karnataka.

Ratings, quantities, the specification you are buying against and the delivery point. We return a quotation with a firm delivery programme.