Aggarwal GlobalEmpowering Nation Enquire

Supply · Meghalaya

Distribution Transformers in Meghalaya

16 kVA – 1000 kVA. Delivery across Meghalaya about 7 days by road, built to the specification your utility or project issues.

Range16 kVA – 1000 kVA
Deliveryabout 7 days by road
StandardIS 1180 (Part 1):2014
Finished distribution transformers in the dispatch yard

Finished distribution transformers in the dispatch yard

01

Logistics and network

Supplying Meghalaya.

Deliveries across Meghalaya start at about 1800 km by road, which puts the nearer cities (Tura, Shillong) within 7 days of dispatch. The state's demand centres on Shillong, Byrnihat industrial area, cement at Jaintia Hills.

Distribution in Meghalaya is handled by MePDCL; MePTCL runs the transmission network. Programmes now in execution include RDSS, and each is tendered against a technical specification that we quote and manufacture to.

02

The product

Any rating in the distribution class.

Full specification and gallery

Distribution transformers are the highest-volume line on the campus — around 900 jobs a month across the full IS 1180 rating ladder, from 16 kVA agricultural units to 1000 kVA industrial supply.

Standard build is Dyn11, ONAN, 11/0.433 kV or 33/0.433 kV, with off-circuit tapping. But almost nothing here is fixed: vector group, impedance, tapping range, winding material, fittings and efficiency level are all specified by the purchaser, and we build to that schedule rather than asking you to accept ours.

ParameterSpecification
Rated capacity16 kVA to 1000 kVA (1 MVA)
PhasesThree-phase and single-phase
TypeOil-immersed, outdoor — sealed corrugated-tank or conservator type; dry type (AN) for indoor duty
Voltage class11 kV, 22 kV and 33 kV systems
Standard voltage ratios11 / 0.433 kV · 22 / 0.433 kV · 33 / 0.433 kV · 11 / 0.25 kV single-phase
Frequency50 Hz standard; 60 Hz for export
03

Specifying

What changes for Meghalaya.

  • Design ambient 40 °C hill climate; seismic classification Zone V for structures and foundations.
  • Inland exposure: standard epoxy-polyurethane exterior finish and hot-dip galvanized steel parts.
  • Temperature rise 45 K winding and 40 K top oil over the stated ambient, or 55 K / 50 K where MePDCL specifications allow; losses, impedance and tapping to the utility schedule or IS 1180 level.
FAQ

Questions

Frequently asked.

How long does delivery of Distribution Transformers to Meghalaya take?
Road transit is about 7 days for a full load over roughly 1800 km. Manufacturing time depends on the rating and quantity and is confirmed with the quotation.
Can you build to the MePDCL specification?
Yes. We quote against the utility's technical specification and guaranteed technical particulars, and routine tests are witnessed at our works by the purchaser or a third-party inspector before dispatch.
Do you supply private buyers and contractors across Meghalaya, not only utilities?
Yes. Industrial plants, EPC contractors, solar developers, builders and dealers across Meghalaya buy directly; send the schedule and we return a quotation with a delivery programme.

Send us your Distribution Transformers schedule for Meghalaya.

Ratings, quantities, the specification you are buying against and the delivery point. We return a quotation with a firm delivery programme.