Aggarwal GlobalEmpowering Nation Enquire

Supply · Nagaland

LT & XLPE Cables in Nagaland

1 – 4 core. Delivery across Nagaland about 8 days by road, built to the specification your utility or project issues.

Range1 – 4 core
Deliveryabout 8 days by road
StandardIS 7098 (Part 1)
Cable hall

Cable hall

01

Logistics and network

Supplying Nagaland.

Deliveries across Nagaland start at about 2210 km by road, which puts the nearer cities (Dimapur, Kohima) within 8 days of dispatch. The state's demand centres on Dimapur industrial area, Kohima.

Distribution in Nagaland is handled by Department of Power, Nagaland; Department of Power runs the transmission network. Programmes now in execution include RDSS, and each is tendered against a technical specification that we quote and manufacture to.

02

The product

Where the chain widened.

Full specification and gallery

LT cable was the second product line the business added, back when it made only poles. It is now a 1,000 kilometre a month operation, and it underpins the underground cable work we are known for in the field.

Because we lay cable as well as make it, the specification we manufacture to is the one we then have to install, joint and commission ourselves. That tends to concentrate the mind on the things that matter — insulation wall consistency, armour quality and drum handling.

ParameterSpecification
ProductXLPE insulated, PVC sheathed power cable
Voltage grade1100 V (1.1 kV) grade; HT grades 3.3 kV to 33 kV to order
ConductorAluminium or copper, Class 2 stranded to IS 8130
Cores1, 3, 3.5 and 4 core
Size rangeAluminium power cable from 4 sq.mm upwards; copper control cable 1.5 to 4 sq.mm
ArmouringGalvanized steel round wire or flat strip to IS 3975, or unarmoured
03

Specifying

What changes for Nagaland.

  • Design ambient 40 °C hill climate; seismic classification Zone V for structures and foundations.
  • Inland exposure: standard epoxy-polyurethane exterior finish and hot-dip galvanized steel parts.
  • Armoured for direct burial where Department of Power practice requires; drum lengths to the installer's schedule; per-drum test certificates.
FAQ

Questions

Frequently asked.

How long does delivery of LT & XLPE Cables to Nagaland take?
Road transit is about 8 days for a full load over roughly 2210 km. Manufacturing time depends on the rating and quantity and is confirmed with the quotation.
Can you build to the Department of Power specification?
Yes. We quote against the utility's technical specification and guaranteed technical particulars, and routine tests are witnessed at our works by the purchaser or a third-party inspector before dispatch.
Do you supply private buyers and contractors across Nagaland, not only utilities?
Yes. Industrial plants, EPC contractors, solar developers, builders and dealers across Nagaland buy directly; send the schedule and we return a quotation with a delivery programme.

Send us your LT & XLPE Cables schedule for Nagaland.

Ratings, quantities, the specification you are buying against and the delivery point. We return a quotation with a firm delivery programme.