Power Transformers in Puducherry

1 – 20 MVA. Delivery across Puducherry about 8 days by road, built to the specification your utility or project issues.

Range1 – 20 MVA
Deliveryabout 8 days by road
Standard1 – 20 MVA
Power transformer under assembly

Power transformer under assembly

01

Logistics and network

Supplying Puducherry.

Deliveries across Puducherry start at about 2390 km by road, which puts the nearer cities (Puducherry, Karaikal) within 8 days of dispatch. The state's demand centres on Puducherry and Karaikal industrial estates, Sedarapet, pharmaceuticals and textiles.

Distribution in Puducherry is handled by Electricity Department, Puducherry; Electricity Department runs the transmission network. Programmes now in execution include RDSS, and each is tendered against a technical specification that we quote and manufacture to.

02

The product

Power-class capability, in-house.

Full specification and gallery

The power transformer line closed the last gap in the chain. Between distribution and power class we now cover 16 kVA right through to 20 MVA — a span very few regional manufacturers hold on a single site.

The standard substation build is 33/11 kV, Dyn11, ONAN, with an off-circuit tap changer at +5% to −10%. Where the network needs voltage regulation under load we fit an on-load tap changer at +5% to −15%, and where the load profile justifies forced cooling we supply ONAF with a rated output at each cooling stage.

ParameterSpecification
Rated power1 MVA to 20 MVA
Typical ratings1 · 1.6 · 2 · 2.5 · 3.15 · 5 · 6.3 · 8 · 10 · 12.5 · 16 · 20 MVA
Voltage class33 / 11 kV; highest system voltage 36 kV
PhasesThree-phase
TypeOil-immersed, outdoor, core type — plain or corrugated tank; dry type to order
Frequency50 Hz standard; 60 Hz for export
03

Specifying

What changes for Puducherry.

  • Design ambient 45 °C humid; seismic classification Zone II for structures and foundations.
  • Coastal and industrial exposure: C5-M grade exterior paint, stainless or hot-dip galvanized hardware and heavier zinc coating on steel parts for sites near the coast.
  • Temperature rise 45 K winding and 40 K top oil over the stated ambient, or 55 K / 50 K where Electricity Department specifications allow; losses, impedance and tapping to the utility schedule or IS 1180 level.
FAQ

Questions

Frequently asked.

How long does delivery of Power Transformers to Puducherry take?
Road transit is about 8 days for a full load over roughly 2390 km. Manufacturing time depends on the rating and quantity and is confirmed with the quotation.
Can you build to the Electricity Department specification?
Yes. We quote against the utility's technical specification and guaranteed technical particulars, and routine tests are witnessed at our works by the purchaser or a third-party inspector before dispatch.
Do you supply private buyers and contractors across Puducherry, not only utilities?
Yes. Industrial plants, EPC contractors, solar developers, builders and dealers across Puducherry buy directly; send the schedule and we return a quotation with a delivery programme.

Send us your Power Transformers schedule for Puducherry.

Ratings, quantities, the specification you are buying against and the delivery point. We return a quotation with a firm delivery programme.