Aggarwal GlobalEmpowering Nation Enquire

Supply · Uttarakhand

Hot & Cold Dip Galvanizing in Uttarakhand

1 m × 7.25 m bath. Delivery across Uttarakhand about 2 days by road, built to the specification your utility or project issues.

Range1 m × 7.25 m bath
Deliveryabout 2 days by road
StandardIS 4759 · ISO 1461
Members leaving the zinc bath

Members leaving the zinc bath

01

Logistics and network

Supplying Uttarakhand.

Deliveries across Uttarakhand start at about 260 km by road, which puts the nearer cities (Roorkee, Haridwar, Dehradun) within 2 days of dispatch. The state's demand centres on Haridwar and Rudrapur-Pantnagar SIDCUL industrial estates, Dehradun, Kashipur, hydro projects.

Distribution in Uttarakhand is handled by UPCL; PTCUL runs the transmission network. Programmes now in execution include RDSS, SIDCUL industrial feeders, and each is tendered against a technical specification that we quote and manufacture to.

02

The product

Coating we control.

Full specification and gallery

Galvanizing was added to the campus for a specific reason: coating was the step that most often delayed tower and structure delivery when it sat with a third party.

Keeping it in-house lets us control coating quality and turnaround on our own structural output — and we sell the same capacity as job work to external fabricators who face the queues we used to.

ParameterSpecification
ProcessHot dip galvanizing and cold dip (electro) galvanizing
Hot dip bath sizeUp to 1 m × 7.25 m
Hot dip capacity2,500 tonnes per month
Cold dip bath sizeUp to 1 m × 3 m
Cold dip capacity50 tonnes per month
Job workSmall lots upward; turnaround On enquiry by tonnage band
03

Specifying

What changes for Uttarakhand.

  • Design ambient 45 °C plains, 35 °C hills; seismic classification Zone V for structures and foundations.
  • Inland exposure: standard epoxy-polyurethane exterior finish and hot-dip galvanized steel parts.
  • Minimum 70 micron zinc coating to IS 4759; heavier coating on request for industrial sites.
FAQ

Questions

Frequently asked.

How long does delivery of Hot & Cold Dip Galvanizing to Uttarakhand take?
Road transit is about 2 days for a full load over roughly 260 km. Manufacturing time depends on the rating and quantity and is confirmed with the quotation.
Can you build to the UPCL specification?
Yes. We quote against the utility's technical specification and guaranteed technical particulars, and routine tests are witnessed at our works by the purchaser or a third-party inspector before dispatch.
Do you supply private buyers and contractors across Uttarakhand, not only utilities?
Yes. Industrial plants, EPC contractors, solar developers, builders and dealers across Uttarakhand buy directly; send the schedule and we return a quotation with a delivery programme.

Send us your Hot & Cold Dip Galvanizing schedule for Uttarakhand.

Ratings, quantities, the specification you are buying against and the delivery point. We return a quotation with a firm delivery programme.