Where we supply
Transformers, conductor and cable for Burundi.
Power equipment manufactured in India to IS and IEC standards for Burundi: shipped Ex Factory or FOB Mundra / Nhava Sheva; CIF Dar es Salaam on request, transit 12 to 16 days to port, 7 to 10 days road.

Export packing at the works
Logistics and network
Shipping to Burundi.
Consignments for Burundi move Sea to Dar es Salaam, then road on the Central Corridor to Bujumbura, about 1,400 km. Typical transit is 12 to 16 days to port, 7 to 10 days road; discharge at Dar es Salaam, then road. We quote Ex Factory or FOB Mundra / Nhava Sheva; CIF Dar es Salaam on request, with payment by LC at sight or advance, USD.
The grid runs at 50 Hz with 400/230 V low-voltage supply and 30 kV medium-voltage distribution; 70 kV and 110 kV transmission, 220 kV interconnection under construction. Distribution is operated by REGIDESO, regulated by Agence de Regulation des secteurs de l'Eau potable et de l'Energie (AREEN). Import conformity: Burundi Bureau of Standards (BBN) and REGIDESO technical specifications; IEC designs.
Products
What we supply in Burundi.
Questions
Frequently asked.
How long does delivery of equipment to Burundi take?
What documents and certificates come with a consignment to Burundi?
Which standard and voltage class do you build to for Burundi?
Tell us what Burundi needs.
Product, ratings, quantities and the specification. We return a quotation with a delivery programme.