Aggarwal GlobalEmpowering Nation Enquire

Supply · Burundi

ACSR Conductors in Burundi

Squirrel to Goat. Manufactured in India to IS and IEC standards and shipped to Burundi: Ex Factory or FOB Mundra / Nhava Sheva; CIF Dar es Salaam on request.

RangeSquirrel to Goat
Delivery12 to 16 days to port, 7 to 10 days road
StandardIS 398 (Part 2):1996
Stranding machine in the conductor hall

Stranding machine in the conductor hall

01

Logistics and network

Shipping to Burundi.

Consignments for Burundi move Sea to Dar es Salaam, then road on the Central Corridor to Bujumbura, about 1,400 km. Typical transit is 12 to 16 days to port, 7 to 10 days road; discharge at Dar es Salaam, then road. We quote Ex Factory or FOB Mundra / Nhava Sheva; CIF Dar es Salaam on request, with payment by LC at sight or advance, USD.

The grid runs at 50 Hz with 400/230 V low-voltage supply and 30 kV medium-voltage distribution; 70 kV and 110 kV transmission, 220 kV interconnection under construction. Distribution is operated by REGIDESO, regulated by Agence de Regulation des secteurs de l'Eau potable et de l'Energie (AREEN). Import conformity: Burundi Bureau of Standards (BBN) and REGIDESO technical specifications; IEC designs.

02

The product

The line between the towers.

Full specification and gallery

ACSR is the workhorse of Indian overhead distribution and transmission. It is also one of the two products that lets us quote a complete line package — tower, conductor, pole and transformer — rather than a part of one.

The table below is the IS 398 (Part 2) basis we manufacture and test against. One caution worth stating plainly: IS 398 Part 5 publishes the same codewords with resistance around 2–3% lower and breaking loads 2–3% higher. Mixing rows from the two parts is the easiest way for a utility QA engineer to catch an error, so we quote Part 2 throughout and say so.

ParameterSpecification
ProductAluminium Conductor Steel Reinforced (ACSR)
StandardIS 398 (Part 2):1996; IEC 61089 for export
CodewordsSquirrel, Gopher, Weasel, Ferret, Rabbit, Mink, Beaver, Raccoon, Cat, Dog, Dingo, Wolf, Lynx, Panther, Bear, Goat
AluminiumEC grade aluminium wire, high UTS
Steel coreGalvanized steel wire
Monthly capacity1,500 km
03

Specifying

What changes for Burundi.

  • Climate and site: Bujumbura at 800 m on Lake Tanganyika, 32 °C; highlands to 2,000 m.
  • ACSR to IEC 61089 or IS 398 as the specification requires, with galvanized steel core to IS 4826 and heavier zinc coating for coastal lines.
  • Drum lengths and drum type to the stringing contractor's requirement; conductor data sheets issued in the utility's format.
  • Documentation: commercial invoice, packing list, certificate of origin, test certificates and the import conformity certificate where Burundi requires one.
FAQ

Questions

Frequently asked.

How long does delivery of ACSR Conductors to Burundi take?
Manufacturing time depends on the rating and quantity and is confirmed with the quotation; shipping is 12 to 16 days to port, 7 to 10 days road via Dar es Salaam, then road. Inspection before dispatch can be arranged for your representative or a third-party agency.
What documents and certificates come with a consignment to Burundi?
Commercial invoice, packing list, certificate of origin, routine test certificates per unit or drum, and the import conformity paperwork: Burundi Bureau of Standards (BBN) and REGIDESO technical specifications; IEC designs.
Which standard and voltage class do you build to for Burundi?
IEC 60076 and related IEC standards for 50 Hz, with 30 kV medium-voltage distribution, or the REGIDESO specification where one is issued. Indian Standard designs with IEC equivalents are also accepted on many schemes.

Send us your ACSR Conductors schedule for Burundi.

Ratings, quantities, the specification you are buying against and the delivery point. We return a quotation with a firm delivery programme.