Where we supply
Transformers, conductor and cable for Ghana.
Power equipment manufactured in India to IS and IEC standards for Ghana: shipped Ex Factory or FOB Mundra / Nhava Sheva, transit 25 to 35 days.

Export packing at the works
Logistics and network
Shipping to Ghana.
Consignments for Ghana move Sea from Nhava Sheva or Mundra to Tema, then road. Typical transit is 25 to 35 days; discharge at Tema; Takoradi for the west. We quote Ex Factory or FOB Mundra / Nhava Sheva, with payment by LC at sight or advance, USD.
The grid runs at 50 Hz with 415/240 V low-voltage supply and 11 kV and 33 kV distribution (34.5 kV in NEDCo northern areas); 161 kV and 330 kV transmission. Distribution is operated by Electricity Company of Ghana (ECG) in the south, NEDCo in the north, GRIDCo for transmission, regulated by Energy Commission and PURC. Import conformity: Ghana Standards Authority EasyPASS conformity assessment, mandatory for electrical equipment (HS 85) shipped from 1 July 2026; GSA inspection at Tema before customs release.
Questions
Frequently asked.
How long does delivery of equipment to Ghana take?
What documents and certificates come with a consignment to Ghana?
Which standard and voltage class do you build to for Ghana?
Tell us what Ghana needs.
Product, ratings, quantities and the specification. We return a quotation with a delivery programme.