Where we supply
Transformers, conductor and cable for Laos.
Power equipment manufactured in India to IS and IEC standards for Laos: shipped Ex Factory or FOB Nhava Sheva; CIF Laem Chabang on request, transit 12 to 18 days to port, 3 to 6 days road.

Export packing at the works
Logistics and network
Shipping to Laos.
Consignments for Laos move Sea from Nhava Sheva to Laem Chabang (Thailand), then road via Nong Khai to Vientiane; or via Da Nang (Vietnam) for the south. Typical transit is 12 to 18 days to port, 3 to 6 days road; discharge at Laem Chabang (Thailand) or Da Nang (Vietnam), then road. We quote Ex Factory or FOB Nhava Sheva; CIF Laem Chabang on request, with payment by LC at sight or advance, USD.
The grid runs at 50 Hz with 400/230 V low-voltage supply and 22 kV distribution as the national standard, with 35 kV in some provinces and 12.7 kV single-wire rural lines; 115 kV transmission. Distribution is operated by Electricite du Laos (EDL) and EDL-Transmission, regulated by Ministry of Energy and Mines. Import conformity: EDL technical specifications and type-test certificates; IEC standards.
Questions
Frequently asked.
How long does delivery of equipment to Laos take?
What documents and certificates come with a consignment to Laos?
Which standard and voltage class do you build to for Laos?
Tell us what Laos needs.
Product, ratings, quantities and the specification. We return a quotation with a delivery programme.