Aggarwal GlobalEmpowering Nation Enquire

Supply · Laos

Solar & Inverter Duty Transformers in Laos

Up to 20 MVA. Manufactured in India to IS and IEC standards and shipped to Laos: Ex Factory or FOB Nhava Sheva; CIF Laem Chabang on request.

RangeUp to 20 MVA
Delivery12 to 18 days to port, 3 to 6 days road
StandardIEC 60076 · IEEE C57.159
Tanks awaiting core-and-coil assembly

Tanks awaiting core-and-coil assembly

01

Logistics and network

Shipping to Laos.

Consignments for Laos move Sea from Nhava Sheva to Laem Chabang (Thailand), then road via Nong Khai to Vientiane; or via Da Nang (Vietnam) for the south. Typical transit is 12 to 18 days to port, 3 to 6 days road; discharge at Laem Chabang (Thailand) or Da Nang (Vietnam), then road. We quote Ex Factory or FOB Nhava Sheva; CIF Laem Chabang on request, with payment by LC at sight or advance, USD.

The grid runs at 50 Hz with 400/230 V low-voltage supply and 22 kV distribution as the national standard, with 35 kV in some provinces and 12.7 kV single-wire rural lines; 115 kV transmission. Distribution is operated by Electricite du Laos (EDL) and EDL-Transmission, regulated by Ministry of Energy and Mines. Import conformity: EDL technical specifications and type-test certificates; IEC standards.

02

The product

A solar transformer is not a distribution transformer with a different label.

Full specification and gallery

An inverter feeds the transformer a non-sinusoidal current with significant harmonic content, and it does so on a duty cycle that is de-energised for roughly half the year. Both facts change the design.

Harmonic currents drive eddy-current heating in the windings that a standard design does not allow for, so conductors are transposed and the core flux density is de-rated to leave headroom. The overnight de-energised period means no-load loss dominates lifetime energy cost far more than it does on a distribution feeder — which is why the low-no-load-loss design is worth paying for here and not always elsewhere.

ParameterSpecification
Rated powerUp to 20 MVA
HV voltage11 kV or 33 kV
LV voltage315 / 380 / 415 / 480 / 600 / 690 / 800 V — the inverter output, not 433 V
Winding arrangementTwo, three or more secondaries; dual secondary is the norm
DutyStep-up, outdoor, solar or wind generation
Frequency50 Hz standard; 60 Hz for export
03

Specifying

What changes for Laos.

  • Climate and site: Tropical monsoon, 40 °C with high humidity; mountainous north.
  • Built to IEC 60076 for 50 Hz, with insulation levels for the 22 kV distribution as the national standard, with 35 kV in some provinces and 12.7 kV single-wire rural lines and 400/230 V secondaries; temperature-rise limits and cooling sized for the stated ambient and altitude.
  • Fittings, bushings and tap-changer ranges follow the utility specification (Electricite du Laos (EDL) and EDL-Transmission); type-test certificates from CPRI or ERDA accompany the offer.
  • Documentation: commercial invoice, packing list, certificate of origin, test certificates and the import conformity certificate where Laos requires one.
FAQ

Questions

Frequently asked.

How long does delivery of Solar & Inverter Duty Transformers to Laos take?
Manufacturing time depends on the rating and quantity and is confirmed with the quotation; shipping is 12 to 18 days to port, 3 to 6 days road via Laem Chabang (Thailand) or Da Nang (Vietnam), then road. Inspection before dispatch can be arranged for your representative or a third-party agency.
What documents and certificates come with a consignment to Laos?
Commercial invoice, packing list, certificate of origin, routine test certificates per unit or drum, and the import conformity paperwork: EDL technical specifications and type-test certificates; IEC standards.
Which standard and voltage class do you build to for Laos?
IEC 60076 and related IEC standards for 50 Hz, with 22 kV distribution as the national standard, with 35 kV in some provinces and 12.7 kV single-wire rural lines, or the Electricite du Laos (EDL) and EDL-Transmission specification where one is issued. Indian Standard designs with IEC equivalents are also accepted on many schemes.

Send us your Solar & Inverter Duty Transformers schedule for Laos.

Ratings, quantities, the specification you are buying against and the delivery point. We return a quotation with a firm delivery programme.