Aggarwal GlobalEmpowering Nation Enquire

Supply · Madhya Pradesh

Solar & Inverter Duty Transformers in Madhya Pradesh

Up to 20 MVA. Delivery across Madhya Pradesh about 3 days by road, built to the specification your utility or project issues.

RangeUp to 20 MVA
Deliveryabout 3 days by road
StandardIEC 60076 · IEEE C57.159
Tanks awaiting core-and-coil assembly

Tanks awaiting core-and-coil assembly

01

Logistics and network

Supplying Madhya Pradesh.

Deliveries across Madhya Pradesh start at about 440 km by road, which puts the nearer cities (Gwalior, Sagar, Ujjain) within 3 days of dispatch. The state's demand centres on Indore and Pithampur auto and pharma, Bhopal and Mandideep engineering, Jabalpur defence, Rewa and Omkareshwar solar, Singrauli power, Satna cement.

Distribution in Madhya Pradesh is handled by MPPKVVCL East, Central and West; MPPTCL runs the transmission network. Programmes now in execution include RDSS, Rewa ultra mega solar, Omkareshwar floating solar, and each is tendered against a technical specification that we quote and manufacture to.

02

The product

A solar transformer is not a distribution transformer with a different label.

Full specification and gallery

An inverter feeds the transformer a non-sinusoidal current with significant harmonic content, and it does so on a duty cycle that is de-energised for roughly half the year. Both facts change the design.

Harmonic currents drive eddy-current heating in the windings that a standard design does not allow for, so conductors are transposed and the core flux density is de-rated to leave headroom. The overnight de-energised period means no-load loss dominates lifetime energy cost far more than it does on a distribution feeder — which is why the low-no-load-loss design is worth paying for here and not always elsewhere.

ParameterSpecification
Rated powerUp to 20 MVA
HV voltage11 kV or 33 kV
LV voltage315 / 380 / 415 / 480 / 600 / 690 / 800 V — the inverter output, not 433 V
Winding arrangementTwo, three or more secondaries; dual secondary is the norm
DutyStep-up, outdoor, solar or wind generation
Frequency50 Hz standard; 60 Hz for export
03

Specifying

What changes for Madhya Pradesh.

  • Design ambient 50 °C; seismic classification Zone III for structures and foundations.
  • Inland exposure: standard epoxy-polyurethane exterior finish and hot-dip galvanized steel parts.
  • Temperature rise 45 K winding and 40 K top oil over the stated ambient, or 55 K / 50 K where MPPKVVCL East specifications allow; losses, impedance and tapping to the utility schedule or IS 1180 level.
FAQ

Questions

Frequently asked.

How long does delivery of Solar & Inverter Duty Transformers to Madhya Pradesh take?
Road transit is about 3 days for a full load over roughly 440 km. Manufacturing time depends on the rating and quantity and is confirmed with the quotation.
Can you build to the MPPKVVCL East specification?
Yes. We quote against the utility's technical specification and guaranteed technical particulars, and routine tests are witnessed at our works by the purchaser or a third-party inspector before dispatch.
Do you supply private buyers and contractors across Madhya Pradesh, not only utilities?
Yes. Industrial plants, EPC contractors, solar developers, builders and dealers across Madhya Pradesh buy directly; send the schedule and we return a quotation with a delivery programme.

Send us your Solar & Inverter Duty Transformers schedule for Madhya Pradesh.

Ratings, quantities, the specification you are buying against and the delivery point. We return a quotation with a firm delivery programme.