Aggarwal GlobalEmpowering Nation Enquire

Where we supply

Transformers, conductor and cable for Uganda.

Power equipment manufactured in India to IS and IEC standards for Uganda: shipped Ex Factory or FOB Mundra / Nhava Sheva; CIF Mombasa on request, transit 10 to 14 days to Mombasa, 5 to 8 days road.

Delivery10 to 14 days to Mombasa, 5 to 8 days road
Products6 lines
StandardsIS and IEC
Export packing at the works

Export packing at the works

01

Logistics and network

Shipping to Uganda.

Consignments for Uganda move Sea to Mombasa, then road on the Northern Corridor to Kampala, about 1,100 km. Typical transit is 10 to 14 days to Mombasa, 5 to 8 days road; discharge at Mombasa (Kenya), then road. We quote Ex Factory or FOB Mundra / Nhava Sheva; CIF Mombasa on request, with payment by LC at sight or advance, USD.

The grid runs at 50 Hz with 415/240 V low-voltage supply and 11 kV and 33 kV distribution; 132 kV transmission. Distribution is operated by Uganda Electricity Distribution Company (UEDCL, which took over the Umeme concession in 2025) and UETCL for transmission, regulated by Electricity Regulatory Authority (ERA). Import conformity: UNBS Pre-Export Verification of Conformity (PVoC): Certificate of Conformity issued in the country of export for consignments above USD 2,000 FOB.

FAQ

Questions

Frequently asked.

How long does delivery of equipment to Uganda take?
Manufacturing time depends on the rating and quantity and is confirmed with the quotation; shipping is 10 to 14 days to Mombasa, 5 to 8 days road via Mombasa (Kenya), then road. Inspection before dispatch can be arranged for your representative or a third-party agency.
What documents and certificates come with a consignment to Uganda?
Commercial invoice, packing list, certificate of origin, routine test certificates per unit or drum, and the import conformity paperwork: UNBS Pre-Export Verification of Conformity (PVoC): Certificate of Conformity issued in the country of export for consignments above USD 2,000 FOB.
Which standard and voltage class do you build to for Uganda?
IEC 60076 and related IEC standards for 50 Hz, with 11 kV and 33 kV distribution, or the Uganda Electricity Distribution Company (UEDCL, which took over the Umeme concession in 2025) and UETCL for transmission specification where one is issued. Indian Standard designs with IEC equivalents are also accepted on many schemes.

Tell us what Uganda needs.

Product, ratings, quantities and the specification. We return a quotation with a delivery programme.