Where we supply
Transformers, conductor and cable for Zambia.
Power equipment manufactured in India to IS and IEC standards for Zambia: shipped Ex Factory or FOB Mundra / Nhava Sheva, transit 12 to 18 days to port, 7 to 12 days road.

Export packing at the works
Logistics and network
Shipping to Zambia.
Consignments for Zambia move Sea to Dar es Salaam, then road on the TAZARA corridor to Lusaka, about 1,900 km; or via Beira or Durban. Typical transit is 12 to 18 days to port, 7 to 12 days road; discharge at Dar es Salaam, Beira or Durban, then road. We quote Ex Factory or FOB Mundra / Nhava Sheva, with payment by LC at sight or advance, USD.
The grid runs at 50 Hz with 400/230 V low-voltage supply and 11 kV and 33 kV distribution; 66 kV, 88 kV, 132 kV and 330 kV transmission. Distribution is operated by ZESCO; Copperbelt Energy Corporation (CEC) on the Copperbelt, regulated by Energy Regulation Board (ERB). Import conformity: Zambia Compulsory Standards Agency (ZCSA) compulsory standards for electrical products and ZABS marks (ZS 688 for cables); pre-shipment verification where applicable.
Questions
Frequently asked.
How long does delivery of equipment to Zambia take?
What documents and certificates come with a consignment to Zambia?
Which standard and voltage class do you build to for Zambia?
Tell us what Zambia needs.
Product, ratings, quantities and the specification. We return a quotation with a delivery programme.