Where we supply
Transformers, conductor and cable for Ethiopia.
Power equipment manufactured in India to IS and IEC standards for Ethiopia: shipped Ex Factory or FOB Mundra / Nhava Sheva; CIF Djibouti on request, transit 8 to 12 days to Djibouti, 3 to 5 days road.

Export packing at the works
Logistics and network
Shipping to Ethiopia.
Consignments for Ethiopia move Sea to Djibouti (Doraleh), then road to Addis Ababa, about 900 km. Typical transit is 8 to 12 days to Djibouti, 3 to 5 days road; discharge at Djibouti (Doraleh), then road. We quote Ex Factory or FOB Mundra / Nhava Sheva; CIF Djibouti on request, with payment by LC at sight or advance, USD.
The grid runs at 50 Hz with 380/220 V low-voltage supply and 15 kV and 33 kV distribution (EEU reports over 54,000 km of 15/33 kV lines); 132 kV, 230 kV and 400 kV transmission. Distribution is operated by Ethiopian Electric Utility (EEU) for distribution and Ethiopian Electric Power (EEP) for generation and transmission, regulated by Ethiopian Petroleum and Energy Authority. Import conformity: ECAE Pre-Export Verification of Conformity: Certificate of Conformity valid six months, issued by an ECAE-authorised body; local inspection and testing for uncertified consignments.
Products
What we supply in Ethiopia.
Questions
Frequently asked.
How long does delivery of equipment to Ethiopia take?
What documents and certificates come with a consignment to Ethiopia?
Which standard and voltage class do you build to for Ethiopia?
Tell us what Ethiopia needs.
Product, ratings, quantities and the specification. We return a quotation with a delivery programme.