Aggarwal GlobalEmpowering Nation Enquire

Supply · Kenya

Solar & Inverter Duty Transformers in Kenya

Up to 20 MVA. Manufactured in India to IS and IEC standards and shipped to Kenya: Ex Factory or FOB Mundra / Nhava Sheva; CIF Mombasa on request.

RangeUp to 20 MVA
Delivery10 to 14 days
StandardIEC 60076 · IEEE C57.159
Tanks awaiting core-and-coil assembly

Tanks awaiting core-and-coil assembly

01

Logistics and network

Shipping to Kenya.

Consignments for Kenya move Sea from Mundra or Nhava Sheva to Mombasa, then road or rail (SGR) to Nairobi. Typical transit is 10 to 14 days; discharge at Mombasa. We quote Ex Factory or FOB Mundra / Nhava Sheva; CIF Mombasa on request, with payment by LC at sight or advance, USD.

The grid runs at 50 Hz with 415/240 V low-voltage supply and 11 kV and 33 kV distribution; 66 kV and 132 kV sub-transmission. Distribution is operated by Kenya Power (KPLC) and KETRACO for transmission, regulated by Energy and Petroleum Regulatory Authority (EPRA). Import conformity: KEBS Pre-Export Verification of Conformity (PVoC): Certificate of Conformity before shipment (Route A, B or C); destination inspection at Mombasa otherwise.

02

The product

A solar transformer is not a distribution transformer with a different label.

Full specification and gallery

An inverter feeds the transformer a non-sinusoidal current with significant harmonic content, and it does so on a duty cycle that is de-energised for roughly half the year. Both facts change the design.

Harmonic currents drive eddy-current heating in the windings that a standard design does not allow for, so conductors are transposed and the core flux density is de-rated to leave headroom. The overnight de-energised period means no-load loss dominates lifetime energy cost far more than it does on a distribution feeder — which is why the low-no-load-loss design is worth paying for here and not always elsewhere.

ParameterSpecification
Rated powerUp to 20 MVA
HV voltage11 kV or 33 kV
LV voltage315 / 380 / 415 / 480 / 600 / 690 / 800 V — the inverter output, not 433 V
Winding arrangementTwo, three or more secondaries; dual secondary is the norm
DutyStep-up, outdoor, solar or wind generation
Frequency50 Hz standard; 60 Hz for export
03

Specifying

What changes for Kenya.

  • Climate and site: Coastal humid at Mombasa; Nairobi and the highlands at 1,500 to 2,100 m, altitude derating applies.
  • Built to IEC 60076 for 50 Hz, with insulation levels for the 11 kV and 33 kV distribution and 415/240 V secondaries; temperature-rise limits and cooling sized for the stated ambient and altitude.
  • Fittings, bushings and tap-changer ranges follow the utility specification (Kenya Power (KPLC) and KETRACO for transmission); type-test certificates from CPRI or ERDA accompany the offer.
  • Documentation: commercial invoice, packing list, certificate of origin, test certificates and the import conformity certificate where Kenya requires one.
FAQ

Questions

Frequently asked.

How long does delivery of Solar & Inverter Duty Transformers to Kenya take?
Manufacturing time depends on the rating and quantity and is confirmed with the quotation; shipping is 10 to 14 days via Mombasa. Inspection before dispatch can be arranged for your representative or a third-party agency.
What documents and certificates come with a consignment to Kenya?
Commercial invoice, packing list, certificate of origin, routine test certificates per unit or drum, and the import conformity paperwork: KEBS Pre-Export Verification of Conformity (PVoC): Certificate of Conformity before shipment (Route A, B or C); destination inspection at Mombasa otherwise.
Which standard and voltage class do you build to for Kenya?
IEC 60076 and related IEC standards for 50 Hz, with 11 kV and 33 kV distribution, or the Kenya Power (KPLC) and KETRACO for transmission specification where one is issued. Indian Standard designs with IEC equivalents are also accepted on many schemes.

Send us your Solar & Inverter Duty Transformers schedule for Kenya.

Ratings, quantities, the specification you are buying against and the delivery point. We return a quotation with a firm delivery programme.