Where we supply
Transformers, conductor and cable for Nigeria.
Power equipment manufactured in India to IS and IEC standards for Nigeria: shipped Ex Factory or FOB Mundra / Nhava Sheva, transit 25 to 35 days.

Export packing at the works
Logistics and network
Shipping to Nigeria.
Consignments for Nigeria move Sea from Nhava Sheva or Mundra to Lagos (Apapa or Tin Can Island), then road. Typical transit is 25 to 35 days; discharge at Lagos: Apapa / Tin Can Island; Onne for the Niger Delta. We quote Ex Factory or FOB Mundra / Nhava Sheva, with payment by LC at sight or advance, USD.
The grid runs at 50 Hz with 415/240 V low-voltage supply and 11 kV and 33 kV distribution (grid code nominal levels 330, 132, 66, 33 and 11 kV). Distribution is operated by Transmission Company of Nigeria (TCN) and the eleven DisCos (Ikeja, Eko, Abuja, Kano, Port Harcourt and others), regulated by Nigerian Electricity Regulatory Commission (NERC); NEMSA for installation safety. Import conformity: SONCAP: a Product Certificate (PC) and a SONCAP Certificate (SC) issued by a SON-appointed agency before shipment, presented at the port; transformers are a stated SON testing focus.
Products
What we supply in Nigeria.
Questions
Frequently asked.
How long does delivery of equipment to Nigeria take?
What documents and certificates come with a consignment to Nigeria?
Which standard and voltage class do you build to for Nigeria?
Tell us what Nigeria needs.
Product, ratings, quantities and the specification. We return a quotation with a delivery programme.