Where we supply
Transformers, conductor and cable for Rwanda.
Power equipment manufactured in India to IS and IEC standards for Rwanda: shipped Ex Factory or FOB Mundra / Nhava Sheva; CIF Dar es Salaam on request, transit 12 to 16 days to port, 7 to 10 days road.

Export packing at the works
Logistics and network
Shipping to Rwanda.
Consignments for Rwanda move Sea to Dar es Salaam, then road on the Central Corridor to Kigali, about 1,400 km; or via Mombasa on the Northern Corridor. Typical transit is 12 to 16 days to port, 7 to 10 days road; discharge at Dar es Salaam or Mombasa, then road. We quote Ex Factory or FOB Mundra / Nhava Sheva; CIF Dar es Salaam on request, with payment by LC at sight or advance, USD.
The grid runs at 50 Hz with 400/230 V low-voltage supply and 30 kV distribution as the national standard, with 15 kV in Kigali and Rwamagana; 110 kV and 220 kV transmission. Distribution is operated by Rwanda Energy Group: Energy Utility Corporation (EUCL) and Energy Development Corporation (EDCL), regulated by Rwanda Utilities Regulatory Authority (RURA). Import conformity: Rwanda Standards Board (RSB) import conformity and REG reticulation standards; IEC designs.
Questions
Frequently asked.
How long does delivery of equipment to Rwanda take?
What documents and certificates come with a consignment to Rwanda?
Which standard and voltage class do you build to for Rwanda?
Tell us what Rwanda needs.
Product, ratings, quantities and the specification. We return a quotation with a delivery programme.