Where we supply
Transformers, conductor and cable for Tanzania.
Power equipment manufactured in India to IS and IEC standards for Tanzania: shipped Ex Factory or FOB Mundra / Nhava Sheva; CIF Dar es Salaam on request, transit 12 to 16 days.

Export packing at the works
Logistics and network
Shipping to Tanzania.
Consignments for Tanzania move Sea from Mundra or Nhava Sheva to Dar es Salaam, then road inland. Typical transit is 12 to 16 days; discharge at Dar es Salaam. We quote Ex Factory or FOB Mundra / Nhava Sheva; CIF Dar es Salaam on request, with payment by LC at sight or advance, USD.
The grid runs at 50 Hz with 400/230 V low-voltage supply and 11 kV and 33 kV distribution; 132 kV, 220 kV and 400 kV transmission. Distribution is operated by Tanzania Electric Supply Company (TANESCO), regulated by Energy and Water Utilities Regulatory Authority (EWURA). Import conformity: TBS Pre-Export Verification of Conformity (PVoC): consignment-based Certificate of Conformity valid three months, issued by Intertek, SGS or TUV Rheinland under the 2025-2028 contract.
Products
What we supply in Tanzania.
Questions
Frequently asked.
How long does delivery of equipment to Tanzania take?
What documents and certificates come with a consignment to Tanzania?
Which standard and voltage class do you build to for Tanzania?
Tell us what Tanzania needs.
Product, ratings, quantities and the specification. We return a quotation with a delivery programme.