Supply · Uttar Pradesh
PCC Poles in Uttar Pradesh
300 poles / day. Delivery across Uttar Pradesh about 2 days by road, built to the specification your utility or project issues.

Pole casting beds under the gantry
Logistics and network
Supplying Uttar Pradesh.
Deliveries across Uttar Pradesh start at about 160 km by road, which puts the nearer cities (Noida, Ghaziabad, Meerut) within 2 days of dispatch. The state's demand centres on Noida and Greater Noida electronics, Ghaziabad and Meerut engineering, Kanpur leather and defence, Lucknow, Agra and Aligarh metalware, Moradabad brass, Varanasi, Gorakhpur GIDA, Bundelkhand solar.
Distribution in Uttar Pradesh is handled by PVVNL, MVVNL, PuVVNL, DVVNL and KESCO; UPPTCL runs the transmission network. Programmes now in execution include RDSS, UP solar policy and Bundelkhand parks, UPPTCL 132 kV expansion, and each is tendered against a technical specification that we quote and manufacture to.
Everything else on this campus was added around the pole yard. Twenty years on it still runs at 300 poles a day, and it remains the product most closely tied to the rural electrification work that built our field record.
One point of accuracy that matters: neither IS 1678 nor IS 785 contains a table of pole dimensions. They are performance standards — they fix the concrete grade, the load factor, the cover, the planting depth and the test method, and leave the section geometry to the standard drawing. A pole dimension table captioned “as per IS 1678” is therefore wrong, and a knowledgeable buyer will notice. We build to IS 1678 and to your drawing, and we say which is which.
| Parameter | Specification |
|---|---|
| Product | Precast prestressed concrete (PSC/PCC) poles |
| Lengths | 9 m and 11 m standard; other lengths as per client request |
| Working load classes | Typically 140, 200, 280 and 300 kg — to your standard drawing |
| Section | Rectangular tapered, constant width with tapering depth |
| Design standard | IS 1678:1998 |
| Dimensions | To utility or REC standard drawing — not defined by IS 1678 |
Specifying
What changes for Uttar Pradesh.
- Design ambient 50 °C; seismic classification Zone IV for structures and foundations.
- Inland exposure: standard epoxy-polyurethane exterior finish and hot-dip galvanized steel parts.
- 9 m and 11 m poles are loaded 20 to 24 per trailer; working load class and the utility's standard drawing confirmed before casting.
Questions
Frequently asked.
How long does delivery of PCC Poles to Uttar Pradesh take?
Can you build to the PVVNL specification?
Do you supply private buyers and contractors across Uttar Pradesh, not only utilities?
Also for Uttar Pradesh
Send us your PCC Poles schedule for Uttar Pradesh.
Ratings, quantities, the specification you are buying against and the delivery point. We return a quotation with a firm delivery programme.