Aggarwal GlobalEmpowering Nation Enquire

Supply · Uttar Pradesh

PCC Poles in Uttar Pradesh

300 poles / day. Delivery across Uttar Pradesh about 2 days by road, built to the specification your utility or project issues.

Range300 poles / day
Deliveryabout 2 days by road
StandardIS 1678:1998
Pole casting beds under the gantry

Pole casting beds under the gantry

01

Logistics and network

Supplying Uttar Pradesh.

Deliveries across Uttar Pradesh start at about 160 km by road, which puts the nearer cities (Noida, Ghaziabad, Meerut) within 2 days of dispatch. The state's demand centres on Noida and Greater Noida electronics, Ghaziabad and Meerut engineering, Kanpur leather and defence, Lucknow, Agra and Aligarh metalware, Moradabad brass, Varanasi, Gorakhpur GIDA, Bundelkhand solar.

Distribution in Uttar Pradesh is handled by PVVNL, MVVNL, PuVVNL, DVVNL and KESCO; UPPTCL runs the transmission network. Programmes now in execution include RDSS, UP solar policy and Bundelkhand parks, UPPTCL 132 kV expansion, and each is tendered against a technical specification that we quote and manufacture to.

02

The product

The line we were founded on.

Full specification and gallery

Everything else on this campus was added around the pole yard. Twenty years on it still runs at 300 poles a day, and it remains the product most closely tied to the rural electrification work that built our field record.

One point of accuracy that matters: neither IS 1678 nor IS 785 contains a table of pole dimensions. They are performance standards — they fix the concrete grade, the load factor, the cover, the planting depth and the test method, and leave the section geometry to the standard drawing. A pole dimension table captioned “as per IS 1678” is therefore wrong, and a knowledgeable buyer will notice. We build to IS 1678 and to your drawing, and we say which is which.

ParameterSpecification
ProductPrecast prestressed concrete (PSC/PCC) poles
Lengths9 m and 11 m standard; other lengths as per client request
Working load classesTypically 140, 200, 280 and 300 kg — to your standard drawing
SectionRectangular tapered, constant width with tapering depth
Design standardIS 1678:1998
DimensionsTo utility or REC standard drawing — not defined by IS 1678
03

Specifying

What changes for Uttar Pradesh.

  • Design ambient 50 °C; seismic classification Zone IV for structures and foundations.
  • Inland exposure: standard epoxy-polyurethane exterior finish and hot-dip galvanized steel parts.
  • 9 m and 11 m poles are loaded 20 to 24 per trailer; working load class and the utility's standard drawing confirmed before casting.
FAQ

Questions

Frequently asked.

How long does delivery of PCC Poles to Uttar Pradesh take?
Road transit is about 2 days for a full load over roughly 160 km. Manufacturing time depends on the rating and quantity and is confirmed with the quotation.
Can you build to the PVVNL specification?
Yes. We quote against the utility's technical specification and guaranteed technical particulars, and routine tests are witnessed at our works by the purchaser or a third-party inspector before dispatch.
Do you supply private buyers and contractors across Uttar Pradesh, not only utilities?
Yes. Industrial plants, EPC contractors, solar developers, builders and dealers across Uttar Pradesh buy directly; send the schedule and we return a quotation with a delivery programme.

Send us your PCC Poles schedule for Uttar Pradesh.

Ratings, quantities, the specification you are buying against and the delivery point. We return a quotation with a firm delivery programme.