Supply · Uttar Pradesh
Power Transformers in Uttar Pradesh
1 – 20 MVA. Delivery across Uttar Pradesh about 2 days by road, built to the specification your utility or project issues.

Power transformer under assembly
Logistics and network
Supplying Uttar Pradesh.
Deliveries across Uttar Pradesh start at about 160 km by road, which puts the nearer cities (Noida, Ghaziabad, Meerut) within 2 days of dispatch. The state's demand centres on Noida and Greater Noida electronics, Ghaziabad and Meerut engineering, Kanpur leather and defence, Lucknow, Agra and Aligarh metalware, Moradabad brass, Varanasi, Gorakhpur GIDA, Bundelkhand solar.
Distribution in Uttar Pradesh is handled by PVVNL, MVVNL, PuVVNL, DVVNL and KESCO; UPPTCL runs the transmission network. Programmes now in execution include RDSS, UP solar policy and Bundelkhand parks, UPPTCL 132 kV expansion, and each is tendered against a technical specification that we quote and manufacture to.
The power transformer line closed the last gap in the chain. Between distribution and power class we now cover 16 kVA right through to 20 MVA — a span very few regional manufacturers hold on a single site.
The standard substation build is 33/11 kV, Dyn11, ONAN, with an off-circuit tap changer at +5% to −10%. Where the network needs voltage regulation under load we fit an on-load tap changer at +5% to −15%, and where the load profile justifies forced cooling we supply ONAF with a rated output at each cooling stage.
| Parameter | Specification |
|---|---|
| Rated power | 1 MVA to 20 MVA |
| Typical ratings | 1 · 1.6 · 2 · 2.5 · 3.15 · 5 · 6.3 · 8 · 10 · 12.5 · 16 · 20 MVA |
| Voltage class | 33 / 11 kV; highest system voltage 36 kV |
| Phases | Three-phase |
| Type | Oil-immersed, outdoor, core type — plain or corrugated tank; dry type to order |
| Frequency | 50 Hz standard; 60 Hz for export |
Specifying
What changes for Uttar Pradesh.
- Design ambient 50 °C; seismic classification Zone IV for structures and foundations.
- Inland exposure: standard epoxy-polyurethane exterior finish and hot-dip galvanized steel parts.
- Temperature rise 45 K winding and 40 K top oil over the stated ambient, or 55 K / 50 K where PVVNL specifications allow; losses, impedance and tapping to the utility schedule or IS 1180 level.
Questions
Frequently asked.
How long does delivery of Power Transformers to Uttar Pradesh take?
Can you build to the PVVNL specification?
Do you supply private buyers and contractors across Uttar Pradesh, not only utilities?
Send us your Power Transformers schedule for Uttar Pradesh.
Ratings, quantities, the specification you are buying against and the delivery point. We return a quotation with a firm delivery programme.