Aggarwal GlobalEmpowering Nation Enquire

Supply · Uttar Pradesh

Substation EPC in Uttar Pradesh

100+ delivered. Delivery across Uttar Pradesh about 2 days by road, built to the specification your utility or project issues.

Range100+ delivered
Deliveryabout 2 days by road
Standard100+ substations
Newly commissioned 33 kV substation, Haryana

Newly commissioned 33 kV substation, Haryana

01

Logistics and network

Supplying Uttar Pradesh.

Deliveries across Uttar Pradesh start at about 160 km by road, which puts the nearer cities (Noida, Ghaziabad, Meerut) within 2 days of dispatch. The state's demand centres on Noida and Greater Noida electronics, Ghaziabad and Meerut engineering, Kanpur leather and defence, Lucknow, Agra and Aligarh metalware, Moradabad brass, Varanasi, Gorakhpur GIDA, Bundelkhand solar.

Distribution in Uttar Pradesh is handled by PVVNL, MVVNL, PuVVNL, DVVNL and KESCO; UPPTCL runs the transmission network. Programmes now in execution include RDSS, UP solar policy and Bundelkhand parks, UPPTCL 132 kV expansion, and each is tendered against a technical specification that we quote and manufacture to.

02

The product

We build what we manufacture.

Full specification and gallery

Substation construction is where the manufacturing comes together. The transformer, the structures, the cable and the conductor are all ours, so a turnkey substation is largely an internal supply chain rather than a procurement exercise.

It also keeps us honest. When the same organisation manufactures the equipment and then has to commission it on site, specification shortcuts become your own problem — a discipline no amount of quality documentation replicates.

ParameterSpecification
ServicesDesign, construction, testing and commissioning
Voltage classes33 kV and 11 kV distribution substations
Substations delivered100+
Line bifurcations800+ at 11 kV
Civil worksFoundations, plinths, trenching, boundary wall and control room
StructuresGantries and equipment structures, fabricated and galvanized in-house
03

Specifying

What changes for Uttar Pradesh.

  • Design ambient 50 °C; seismic classification Zone IV for structures and foundations.
  • Inland exposure: standard epoxy-polyurethane exterior finish and hot-dip galvanized steel parts.
  • 33/11 kV substation design, civil works, structures, equipment supply and commissioning to the UPPTCL and DISCOM specifications; HVPNL-pattern layouts available.
FAQ

Questions

Frequently asked.

How long does delivery of Substation EPC to Uttar Pradesh take?
Road transit is about 2 days for a full load over roughly 160 km. Manufacturing time depends on the rating and quantity and is confirmed with the quotation.
Can you build to the PVVNL specification?
Yes. We quote against the utility's technical specification and guaranteed technical particulars, and routine tests are witnessed at our works by the purchaser or a third-party inspector before dispatch.
Do you supply private buyers and contractors across Uttar Pradesh, not only utilities?
Yes. Industrial plants, EPC contractors, solar developers, builders and dealers across Uttar Pradesh buy directly; send the schedule and we return a quotation with a delivery programme.

Send us your Substation EPC schedule for Uttar Pradesh.

Ratings, quantities, the specification you are buying against and the delivery point. We return a quotation with a firm delivery programme.